
New TopShim run:

version = topshim 2.4.0
date = 2024-10-10
time = 18:42:35.702
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 6.0 Hz, Target= 0.9 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 1.2 Hz, After= 1.3 Hz
Iteration  3: FWHM Before= 1.3 Hz, Target= 0.8 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.15


Performing tune after shimming
tune lock level increase = 1.2

shim changes: 
Z	-21
Z2	-56
Z3	+102
Z4	-258
Z5	+139
X	+137
Y	+138

duration = 3 min 2 sec
completed successfully
finished Thu Oct 10 18:45:36 2024


========================================================================
